DESCRIPTION | When one or more of the 'required' atomic tests of an AMA/Billable panel remain in the PENDING status by the roll-up date, the laboratory sends the individual atomic level CPT codes for each verified test to PCE. On the roll-up date the laboratory software searches the previous calendar monthfor panel tests in the pending status. The roll-up date can be found in the PROCESS PANEL DATE field (#620) of theLABORATORY SITE file (#69.9). This report identifies AMA/Billable panel tests from the previous calendar month that have one or more 'required' atomic tests that are still in a pending status and require review. |